Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3958.65
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Jun 06, 2008     Elevator horn drilling; Fairing test-fit; Tail removal - (1.4 hours)       Category: Controls
Today I enlarged the bolt holes through the elevator horns for the center bearing bolt, then mounted both elevators and checked the hole alignment by installing an AN4-17A bolt. It turned out better than I ever could have hoped. Sweet!

Before disassembly, I decided to test-fit the empennage fairing I bought a few months ago from Fairings Etc. The fit was pretty good right out of the box. It looks like it will require very few modifications.

The main part of the empennage installation is now done, so I removed the entire tail assembly from the airplane. I carefully bagged and labeled the various bolts, washers, and nuts so I can identify them later. All the tail surfaces will now go back into storage for a while.

I removed the elevator "up-stop" angle and began sanding it and cleaning up the rough edges. I also vacuumed the fuselage out and ran a magnet-on-a-stick down into the nooks and crannies of the aft fuselage. It was amazing how many steel shavings I got out of there.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.